Right arrow End of Line Testing Flooring

End of Line Testing Flooring Requirements for Rolling Road Areas

End of line test zones bring together rolling roads, brake test rigs and calibration bays, often concentrated at the final stage of the line. Floors must carry significant point loads beneath equipment frames, control vibration transmission into neighbouring areas and maintain precise levels at access ramps and stopping points. These spaces are usually built on engineered concrete slabs with targeted levelling and resurfacing treatments around test rigs and walkways that may include polished concrete routes, all coordinated with the wider automotive production plant flooring plan.

20 +

Years
Working Around Vehicle Test Areas

Test cells sit at the point where completed vehicles are driven, stopped, restrained and run against rollers. The floor must anchor equipment accurately, support repeated wheel loads and give operators and technicians reliable footing in tight spaces. Our focus is on slab behaviour, joint layout and surface finish so end of line testing can operate safely and consistently alongside paint, assembly and despatch zones.

Article Focus

Right arrow How Test Equipment Interacts with the Floor

Rolling roads, brake testers and alignment rigs all rely on the floor to provide a stable reference plane. Loads from vehicle axles and restraint systems are transferred through steel frames into the concrete, while moving rollers and wheels introduce dynamic forces. At the same time, operators need predictable levels on approach ramps, around control desks and at escape paths. If slab performance or surface detailing is poor, test results can be harder to repeat and day to day operation becomes less efficient.

End of line zones often sit close to logistics routes that have already been configured using approaches developed for forklift wheel path floors and oil and coolant management areas. Floor specifications in testing areas therefore need to coordinate with these neighbouring activities while still meeting the particular demands of dynamic vehicle tests.

Right arrow Core Flooring Needs in Test and Calibration Bays

  • Stable support beneath rolling road frames, brake testers and restraint systems.
  • Controlled levels at ramps and entry points where vehicles drive onto equipment.
  • Joint positions that do not conflict with anchorage or pit edges.
  • Surfaces that cope with tyre scuffing, minor fluid spills and frequent clean-down.
  • Clear differentiation between test zones, observation areas and general walkways.

Right arrow Common Floor Problems in End of Line Test Areas

When floor specification is not aligned with test equipment demands, issues tend to show up first as nuisance events, access difficulties or gradual shifts in test repeatability rather than immediate structural failure.

Cracking or settlement around rolling road pits and restraint anchor points

Steps or lips at ramp interfaces that unsettle drivers or affect entry speed

Surface polishing or tyre marks that reduce grip for operators and vehicles

Joint lines running directly beneath key support legs or test frames

Localised ponding of water or coolant from test activities and wash-down

Tight working areas where uneven floor levels complicate escape routes and access

Right arrow Our Process

How We Specify Floors for End of Line Testing

STAGE 1

Test Area Walk Down and Review

We review existing test and calibration bays with your engineering, maintenance and safety teams. This includes pit layouts, frame locations, approach ramps, observation points and escape routes. We also look at how vehicles arrive from nearby conveyor or AGV fed lines, drawing on patterns seen in conveyor interface floors and internal transport routes to understand wider context.

Double arrowsSTAGE 2

Floor Specification and Detailing

We develop a floor specification that accounts for static and dynamic loads, joint layout, surface behaviour and clean-down requirements. This can include local levelling around ramps, infill and recut of joints that conflict with anchorage positions, and chosen surface finishes in working, observation and vehicle movement zones so each area behaves as expected in day to day use and during safety drills.

Double arrowsSTAGE 3

Implementation and Operational Handover

Works are planned around maintenance windows, model changes or equipment upgrades. We phase activity so testing capacity is maintained where possible, isolating bays or sections in turn. On completion, levels, access routes and surface response are checked with your teams before the updated zones are brought fully back into service and incorporated into standard test routines.

Alignment and Repeatability

Floors are specified so equipment frames and pits remain stable, helping support consistent test results over time even as vehicles and conditions change across model cycles.

Vehicle Access and Control

Ramps and stopping areas are shaped to give drivers predictable entry, braking and positioning, reducing the risk of overrun and making repeat test sequences easier to manage shift after shift.

Operator Safety and Escape

Floor levels and surface textures around test equipment support clear walkways, escape paths and observation positions, helping teams move confidently in what are often tight and equipment dense spaces.

Cleaning and Presentation

Specifications consider the liquids, tyre marks and residues typically encountered in end of line areas so cleaning routines can maintain both safe conditions and a presentable environment for visitors and audits.

Discuss End of Line Testing Flooring

If rolling roads, brake testers or calibration bays are held back by floor issues, a focused review of slab performance and surface detailing can unlock improvements in both safety and test flow.

Contact us to outline your current test arrangements and upgrade plans:

Or send your details using the form below and we will respond promptly.

Right arrow FAQ

End of Line Testing Floors Common Questions

Why is floor specification so important in rolling road areas?
Rolling roads concentrate significant loads and vibration into defined frames and pits. If the floor beneath moves, cracks or settles, it can affect equipment alignment, test repeatability and even restraint performance. A well specified floor helps keep the test rig stable across its working life and reduces corrective maintenance on both the structure and the concrete below.
Do test bays need different floors to the rest of the plant?
They often do. While general assembly areas may focus on wide open movement and joint performance under forklifts or AGVs, test bays have concentrated loads, dynamic forces and close contact between vehicles, equipment and operators. This leads to different priorities for slab thickness, joint layout and surface detailing compared with nearby production lines or logistics routes.
How do floor levels affect end of line testing?
Floor levels influence how vehicles climb ramps, stop on rollers and sit in relation to test equipment. Small changes over time can alter driver perception, braking behaviour and the forces experienced by the rig. Controlled levels at ramps, stopping points and observation areas help maintain consistent test conditions and smooth day to day operation for drivers and technicians alike.
Can we improve test area floors without rebuilding the whole slab?
In many sites, targeted works deliver strong benefits. Local levelling, joint repairs, resurfacing around pits and improved ramp detailing can all be carried out without full reconstruction, provided the underlying slab is sound. The starting point is a detailed survey to understand where structural issues exist and where surface focused improvements are sufficient.
How are projects managed when test capacity must be maintained?
Floor works in end of line zones are usually phased around planned stoppages or model changes. Bays may be treated one at a time, with temporary adjustments to test sequencing. Early planning with operations and maintenance teams allows improvements to be made while still preserving enough capacity to support ongoing vehicle production commitments.