Drainage, Wash-Down and Wet-Work Zones
Wash-down bays, wet-work corners and vehicle cleaning lines concentrate water, detergents, brake dust and workshop fluids in a small footprint. If falls, channels and surface systems are not planned as part of the floor design, water ponds in unintended areas, contaminants track into dry bays and sub-surface damage accelerates. We treat drainage and wet-work arrangements as integral to the wider automotive workshop and garage flooring layout, not as bolt-on fixtures.
20 +
Years
Designing Workshop Drainage Floors
Wet-work zones sit alongside service bays, pits, EV areas and paint rooms, all sharing the same structural slab. Falls and channels influence how oil, brake fluid, coolant and detergents move across these surfaces, echoing the behaviours described in our work on fluid exposure in workshop floors. Our focus is to ensure drainage supports cleaning, safety and containment without undermining slab performance or neighbouring processes.
How Wet-Work Zones Influence Workshop Floor Behaviour
In automotive workshops, water is rarely just clean rinse water. It often carries road film, oils, brake dust and cleaning chemicals that interact with the slab, coatings and joint details. Wash-down bays, underbody rinse lines and detailing corners can receive far more water than general floors, and that water needs controlled falls and drainage points so it does not sit against pit edges, lift bases or door thresholds.
When new workshops are built, these demands can be addressed at the earliest stage of concrete slab installation, with falls, channel locations and reinforcement designed as one system. On existing sites, local reprofiling and resurfacing can correct poor falls or damaged channels, while internal approach corridors and reception routes may use polished concrete finishes that are easier to keep dry and visually clean.
Key Floor Expectations in Drainage and Wet-Work Areas
Where Drainage and Wet-Work Problems Show First
Poorly planned drainage rarely fails in one dramatic event. Instead it shows as gradual changes in how surfaces look and behave, especially around channel edges, gullies, doorways and neighbouring dry zones.
Standing water in low spots that never quite dry between shifts.
Softened or stained bands along channels carrying oil and coolant laden water.
Surface fretting and joint breakdown where wash-down water crosses door lines.
Damp edges and cracking around pits and inspection steps in wet zones.
Visible trails where squeegee paths always follow the same slight fall errors.
Water, foam and debris tracking into tyre bays and MOT lanes instead of staying in wet areas.
Our Approach
STAGE 1
We begin by mapping where water is introduced, how it is used and where it currently flows. That includes hoses, lances, underbody rinsers, roof sprays and manual wash-down routines, plus any links to pits or drying bays described in our work on pit integration. Observations are combined with level checks to understand how the slab really drains, not just how drawings suggest it should.
STAGE 2
Using the survey data, we redesign falls and channel layouts so that water and contaminants move towards defined catchments instead of across entrances or dry bays. This may involve local reprofiling, new channel positions or the rebuilding of weak edges. Surface systems are chosen to cope with frequent wetting, detergents and the tyre and coating effects explored in hot tyre pick-up studies, while still allowing practical cleaning routines.
STAGE 3
Wet-work upgrades are phased to keep key bays available wherever possible. Sections are taken out of use, prepared and reprofiled before new channels, toppings and finishes are installed. Particular care is taken at interfaces with dry bays, entrances and EV areas, where levels and textures must remain predictable. Once works are complete, we provide guidance on wash-down routines and equipment so that the new drainage arrangements perform as intended day to day.
Small changes in level can transform how water behaves. We measure and adjust falls so that liquids move where they are meant to, reducing ponding and preventing run-off into pits, entrances or customer routes.
Channels and gully edges are frequent weak points. We pay close attention to arrises, joint positions and reinforcement so that edges do not break down under traffic, squeegees and wash-down equipment.
Wet zones must remain safe underfoot and under tyre. We balance texture against cleanability, ensuring that surfaces hold grip when wet but do not trap sludge, foam and debris in deep profiles that are hard to remove.
Drainage does not stop at bay lines. We coordinate wet-work floors with nearby service bays, MOT lines, EV zones and entrances so that water, dirt and fluids are contained rather than spread across the building.
We support workshops across the UK in assessing, redesigning and upgrading drainage, wash-down and wet-work zones as part of wider flooring programmes.