Right arrow Concrete Slab Installation Newport

Industrial Concrete Flooring
for Newport Warehouses

Warehouse Flooring Solutions provides concrete slab installations for warehouses, logistics hubs, and industrial units across Newport and the South East Wales region. Each floor is designed for load capacity, durability, and precision flatness to meet the demands of modern operations.

20 +

Years
Experience in Concrete Flooring

Our experienced teams operate throughout Newport, including Llanwern, Queensway Meadows, and Imperial Park, delivering complete slab solutions from ground preparation and reinforcement to concrete pouring and finishing. Each floor is constructed for long-term strength and surface accuracy.

Our Expertise

Right arrow Our Process

How We Deliver Concrete
Slab Installations in Newport

STEP 1

Design &
Preparation

We review site conditions, access, and loading to set slab thickness, reinforcement, and joint layout. Planning considers warehouse traffic patterns across Newport locations such as Llanwern, Queensway Meadows, and Imperial Park.

Right facing arrows STEP 2

Pouring &
Finishing

Our crews manage formwork, reinforcement placement, and concrete pours using laser guided equipment. Power floating and controlled curing achieve the required flatness and surface quality for warehouse and logistics operations.

Right facing arrows STEP 3

Quality Control &
Handover

Slabs are checked for strength, surface regularity, and finish. Handover includes test results, joint layout information, and maintenance guidance to support reliable service in Newport facilities.

Right arrow Why Choose Us

Concrete Floors Built for
Strength, Accuracy and Dependability

Concrete floor installation in Newport warehouse
Structural strength icon

Structural
Performance

Each slab is designed for load-bearing strength, durability, and resistance to cracking. Reinforcement and mix design are specified to suit warehouse and logistics facilities throughout Newport and South East Wales.

Laser screed concrete installation Newport
Precision accuracy icon

Laser-Guided
Accuracy

Floors are placed and levelled using laser-guided systems to achieve consistent surface flatness. This supports efficient warehouse traffic and racking alignment in industrial estates such as Queensway Meadows and Imperial Park.

Power floated concrete floor in Newport industrial unit
Durability and compliance icon

Durability &
Compliance

Surfaces are cured and sealed to reduce wear and surface dusting. All work is carried out in line with UK concrete flooring standards, supporting consistent performance across Newport warehouses and distribution centres.

Right arrow Newport and surrounding areas

We supply and install industrial and warehouse concrete flooring across Newport and surrounding areas in South East Wales. Our projects extend through Llanwern, Rogerstone, Magor, Caldicot, Pontypool, and Cwmbran, supporting logistics, storage, and manufacturing facilities throughout the region.

Newport

Llanwern

Rogerstone

Magor

Caldicot

Pontypool

Cwmbran

Get a Quote for Concrete Flooring in Swansea

Our experienced team installs industrial and warehouse concrete floors across Swansea, Neath, and Port Talbot. We deliver high-performance results with precision pouring, finishing, and curing for lasting durability.

Contact us today to discuss your project or request a free quote:

Or complete the form below and our Swansea flooring specialists will get back to you shortly.

Right arrow FAQ

Concrete Slab Installation Newport
Common Questions

Do you provide site surveys in Newport?
Yes. We carry out initial site visits across Newport, including Llanwern, Queensway Meadows, and Imperial Park. The survey reviews sub base conditions, access, drainage, and the correct slab specification for warehouse use.
What pour sizes and programme durations do you handle?
Typical daily pours range from 300 to 1,000 m² depending on access, joint layout, and plant availability. Many warehouse slabs in the Newport area complete within one to three weeks for the slab phase, subject to sequencing with other trades.
Can you coordinate works around live operations at Queensway Meadows or Imperial Park?
Yes. We phase work areas and plan delivery windows to maintain safe routes for ongoing operations. Method statements and RAMS are issued in advance and updated as the programme progresses on active sites.
How do you manage weather risk near the Severn estuary?
We monitor short term forecasts and select pour times to avoid heavy rain or high winds. Temporary sheeting, wind breaks, and controlled curing are used to protect finish quality and evaporation rates on exposed sites around Newport.
What reinforcement options do you offer for forklift and racking traffic?
We specify mesh, steel fibres, or a hybrid approach to match load cases and joint spacing. Armoured joints and arris protection are installed at loading bays and door thresholds to reduce edge damage under regular MHE use.
How is surface flatness controlled for narrow aisle racking?
Laser guided placement and power floating are used to achieve consistent flatness across large pours. Floors are checked against UK surface regularity tolerances when specified for high bay or VNA systems in Newport facilities.
When can racking and MHE be installed after pouring?
Light foot traffic is usually possible after 24 to 48 hours. Racking and materials handling equipment are introduced after strength testing confirms the required performance, with typical full loading after 7 to 14 days depending on conditions and specification.
What documentation is provided at handover?
Handover includes test results, joint layout drawings, curing guidance, and maintenance recommendations. Where requested, we confirm compliance with applicable UK concrete flooring standards for the scope of works.