Warehouse Floor Resurfacing Southampton
We deliver warehouse floor resurfacing and industrial overlay systems across Southampton and the wider Solent area. Existing concrete slabs are refurbished using bonded self levelling compounds, polymer modified overlays and resin finishes, specified to suit port logistics, storage and distribution facilities and to improve surface condition, levelness and durability under intensive materials handling.
20 +
Years
Experience in Concrete Flooring
Our Southampton resurfacing work covers Western Docks and Eastern Docks, Millbrook, Nursling Industrial Estate, Totton, Marchwood, Adanac Park and distribution hubs along the M27 and M271. Floors range from high throughput port warehouses and automotive compounds to regional distribution centres and chilled storage. We assess slab condition, plan repairs and preparation and install an overlay matched to the site’s load profile and traffic pattern.
Our Expertise
Our Process
STEP 1
We start by reviewing the existing concrete slab, looking at cracking, joint breakdown, impact damage, surface wear and any delamination or contamination. Port-related facilities in Western and Eastern Docks and older units around Millbrook often contain historic coatings, oil staining and localised patch repairs that must be addressed. Defects are broken out and reinstated, joints are rebuilt where required and incompatible finishes are removed. The slab is then mechanically prepared using grinding, shot blasting and diamond tooling to create a clean, profiled substrate ready for a bonded warehouse floor overlay.
STEP 2
After preparation we install the chosen industrial floor overlay. Systems may include polymer modified cementitious toppings, cement based self levelling compounds or resin finishes for areas where chemical resistance or very smooth surfaces are required. Thickness and flow are controlled to remove local undulations, improve regularity through racking aisles and marshalling areas and to provide predictable running conditions for forklifts, pallet trucks and tugs in Southampton warehouses and port logistics facilities along the M27 corridor.
STEP 3
Once the overlay is placed it is cured in line with product guidance and the agreed programme. Fast track options can allow controlled early access, typically in the 24 to 48 hour range for light traffic, with full forklift loading and dense storage introduced when strength and hardness targets have been achieved. Movement and construction joints are reinstated or recut so the slab continues to behave correctly and edge damage is minimised. At handover we review the finish and provide maintenance and operating guidance tailored to the Southampton facility and its duty.
Why Choose Us
Coastal and port-adjacent buildings often experience contamination, moisture variation and multiple historic repairs. In Southampton we place particular emphasis on mechanical preparation, cleaning and moisture assessment so primers and bonding agents can work effectively. This helps the overlay act compositely with the original slab and reduces the risk of debonding or surface movement under intensive forklift and tug traffic typical of port logistics environments.
Facilities serving container traffic, automotive compounds or cruise and ferry operations often have fixed windows for loading and consolidation. We plan resurfacing works around ship schedules, delivery peaks and trunking routes on the M27 and M271, using phased bays, temporary access and, where required, night or weekend shifts. This approach supports continuity while still giving adequate time for preparation and curing of the industrial floor overlay.
Full slab replacement in an occupied warehouse or port shed is highly disruptive and costly. Resurfacing allows the structural concrete to remain where it is sound, while renewing the wearing layer with a system designed for abrasion, impact and smooth running. For Southampton operators this can extend floor life, reduce ongoing patch repairs and provide a more predictable maintenance profile over the life of the building.
Southampton and Surrounding Areas
We undertake warehouse floor resurfacing and industrial overlay projects across Southampton and the Solent region, supporting port logistics, distribution, storage and production facilities along the M27 and coastal corridors.
Southampton
Western Docks
Eastern Docks
Millbrook
Nursling Industrial Estate
Totton
Marchwood
Adanac Park and M271 Corridor
We provide warehouse resurfacing, slab repairs and industrial floor overlay systems throughout Southampton, including Western and Eastern Docks, Millbrook, Nursling, Totton and Marchwood. Our service covers survey, defect repair, mechanical preparation and installation of bonded overlays selected for the loads, traffic and operating conditions of your facility.
Contact us to discuss a Southampton warehouse, port logistics shed or regional distribution centre, or to arrange a site visit and detailed proposal.
Or fill in the form below and our Southampton resurfacing team will respond promptly.
FAQ