Right arrow Warehouse Floor Resurfacing Yate

Yate Warehouse
Floor Resurfacing & Overlays

We provide warehouse floor resurfacing and industrial overlay systems across Yate and North Bristol. Existing concrete slabs in logistics, storage and production buildings are refurbished using bonded self levelling compounds, polymer modified cementitious overlays and resin finishes that are specified to restore surface condition, improve levelness and support daily forklift and pallet truck traffic.

20 +

Years
Experience in Concrete Flooring

Our Yate resurfacing work covers Stover Trading Estate, Beeches Industrial Estate, Badminton Road Trading Estate, Great Western Business Park and Westerleigh Business Park, as well as nearby employment areas serving the Avon Ring Road and the M4 and M5 corridors. Sites range from long serving industrial units with multiple historic repairs to modern trade parks and distribution hubs. Each project is planned around a condition survey, mechanical preparation and an overlay system designed in line with BS 8204, BS EN 206 and current UK industrial flooring practice.

Our Expertise

Right arrow Our Process

How We Resurface Warehouse
Floors in Yate

STEP 1

Slab Survey,
Repair and Preparation

We begin with a structured review of the existing concrete slab. Cracks, joint breakdown, impact damage, surface wear, contamination and any delamination or patch repairs are identified and recorded. In Yate this often includes mixed age units at Stover, Beeches and Badminton Road Trading Estate where previous coatings and repairs may sit over the original concrete. Defective areas are broken out and reinstated, joints are rebuilt where required and unsuitable finishes are removed. The slab is then mechanically prepared using grinding, shot blasting and diamond tooling to create a clean, profiled surface ready for a bonded industrial floor overlay.

Right facing arrows STEP 2

Overlay Application
and Level Management

Once preparation is complete we install the specified overlay system. Options include polymer modified cementitious toppings for higher duty zones, cement based self levelling systems to refine levels over larger bays and resin finishes where abrasion resistance, cleanability or chemical resistance is important. Thickness and flow are controlled to reduce local high and low spots and improve regularity along racking aisles, pallet routes and loading zones in Yate warehouses and industrial units across Stover Trading Estate, Great Western Business Park and Westerleigh Business Park.

Right facing arrows STEP 3

Curing, Joints
and Handover

After installation the overlay is cured in line with the chosen system and the agreed programme. On suitable schemes fast curing materials can allow controlled early access in roughly 24 to 48 hours, with full forklift loading and dense storage introduced once strength and surface hardness targets have been achieved. Movement and construction joints are recut or reinstated to manage slab behaviour and to help limit future edge damage. At handover we carry out finish checks and provide maintenance and operating guidance aligned with the Yate facility and its duty profile.

Right arrow Why Choose Us

Warehouse Floors Resurfaced for
North Bristol and Yate

Warehouse floor resurfacing in Yate industrial unit
Load capacity icon

Substrate Condition
and Bond Performance

Yate’s core estates combine long established industrial buildings and newer trade parks. Repair histories, previous coatings and localised infill works can all influence how an overlay behaves. We focus on substrate strength, moisture and contamination checks together with correct mechanical profiling so primers and bonding agents can work as intended. A stable, well prepared base helps the overlay act compositely with the slab and reduces the risk of debonding under regular forklift and pallet truck movements.

Concrete overlay project in Yate warehouse
Surface profile icon

Programme Planning
for M4 and Avon Routes

Many Yate facilities support regional flows between Bristol, South Gloucestershire and the M4 and M5 corridors via Badminton Road, the Avon Ring Road and the A432. We plan resurfacing around intake and despatch schedules, trunking runs and shift patterns, using phased work zones and temporary access where required. This helps maintain throughput while still allowing adequate time for preparation, overlay installation and curing.

Resurfaced warehouse floor in Yate and South Gloucestershire
Repair efficiency icon

Service Life
and Cost Efficiency

Full slab replacement is disruptive and capital intensive, particularly in occupied Yate units with installed racking, services and plant. Resurfacing retains the structural slab where it remains sound and renews the wearing surface with a system matched to the site’s duty. This approach can extend the working life of the floor, reduce reactive patch repairs and support a more predictable maintenance profile for operators across Yate and the wider North Bristol area.

Right arrow Yate and Surrounding Areas

We carry out warehouse floor resurfacing and industrial overlay projects across Yate and South Gloucestershire, supporting logistics, storage and manufacturing facilities linked to North Bristol’s main road and rail routes.

Yate

Stover Trading Estate

Beeches Industrial Estate

Badminton Road Trading Estate

Great Western Business Park

Westerleigh Business Park

Chipping Sodbury

Westerleigh and A432 Corridor

Request a Quote for Warehouse Floor Resurfacing in Yate

We provide warehouse resurfacing, slab repairs and industrial overlay systems throughout Yate, including Stover Trading Estate, Beeches Industrial Estate, Badminton Road Trading Estate, Great Western Business Park and Westerleigh Business Park. Our service covers surveys, defect repair, mechanical preparation and installation of bonded overlay systems matched to your loading, traffic and operating conditions.

Contact us to discuss a Yate warehouse, distribution unit or production facility, or to arrange a site visit and detailed proposal.

Or fill in the form below and our Yate resurfacing team will respond promptly.

Right arrow FAQ

Warehouse Floor Resurfacing Yate
Common Questions

Do you work in occupied warehouses at Stover and Beeches Industrial Estates?
Yes. Most Yate schemes are completed while the building remains operational. We phase resurfacing so only part of the floor is taken out of use at a time and agree work zones, access routes and possession windows around delivery patterns and shift times on the estates.
Can you deal with multiple historic coatings and repairs on older Yate floors?
We regularly work on floors that have received several generations of coatings, screeds and patch repairs. Our process includes identifying incompatible or weak layers, removing them where necessary, reinstating defective concrete and mechanically preparing the remaining slab so the new overlay can be bonded to sound material.
What types of resurfacing systems do you typically install in Yate warehouses?
We install cement based self levelling systems, polymer modified cementitious overlays and resin finishes. The system is selected based on slab condition, load levels, materials handling equipment, internal climate, cleaning regime and the level of surface regularity and finish required for the Yate facility and its operations.
Is resurfacing suitable where we need improved levelness for racking aisles?
Yes. Self levelling and engineered topping systems can reduce local high and low spots and improve overall regularity across racking aisles, pallet routes and marshalling zones. This is particularly useful in high bay and narrow aisle warehouses at Stover, Badminton Road Trading Estate and Great Western Business Park where tighter tolerances are required for MHE and racking alignment checks.
How soon can forklift traffic return to a resurfaced floor in Yate?
Return to use depends on the chosen overlay system, thickness and ambient conditions. Some fast curing products allow controlled light traffic within about 24 to 48 hours, with full forklift loading and dense storage introduced once specified strength and hardness have been achieved. We provide project specific timings so activity at the Yate site can be planned safely around the works programme.
Do you cover nearby locations such as Chipping Sodbury and Westerleigh?
Yes. We resurface warehouse and industrial floors across Yate and the surrounding area, including Chipping Sodbury, Westerleigh, the A432 corridor and other North Bristol and South Gloucestershire locations that link into the same road network and employment zones as the main Yate estates.
What information helps you prepare a resurfacing quotation for a Yate site?
Helpful information includes approximate floor area, age and condition of the slab, known defects, load and MHE types, access constraints, working hours and any planned layout or racking changes. Photographs, existing survey data or layout drawings from the Yate facility also support accurate specification and programming.